Maintenance And Maintenance Of Crawler - Type Shot Blasting Machine
Jan 04, 2017

1, the machine should be cleaned after each class again.

2, should always check the clean room of the shield and shot blasting the directional sleeve, sub-round of rounds and other wear and tear, if serious wear and tear, should be replaced immediately.

3, the machine before the operation, where there are parts of the movement are required lubrication, Shotblast spindle bearings, plus 2 # calcium-based grease once a week. Screw conveyor, hoist on the bearing, plus 2 # calcium-based grease once a month. The remaining bearing every 3-6 months plus 2 # calcium-based grease once. Chain and other parts of the activities of a week plus a mechanical oil, lubricating motor lubrication requirements on schedule.

4, regular inspection of each transmission parts, cleaning parts, replacement of worn parts.

5, the machine in the inspection and maintenance, we must cut off the power to avoid accidents.

6, the machine work for 48 hours to check the fan, and remove the dust attached to the sub-wheel to ensure smooth operation of the fan and service life.

7, the cleaning room of the protection board can be replaced according to the situation on a regular basis, replacement, the board should be installed to control the clearance gap of 1.5 mm or less.

8, the track replacement, the front door open, remove all interference pieces, with 10 # steel do four hook from the upper part of the process chamber hole will drive shaft and crawler suspension, the track from the door tilt incline.


We're Here to Help

  • Add:Dalong Industrial Park, Xituan Town, Dafeng District, Yancheng City, Jiangsu Province, China
    Tel:+86-515-83755555
    Fax:+86-515-83752143
    Mob:+86-13912337992
    E-mail:ycfengte@photycn.com
    Skype:joycezhaomin1986
    WhatsApp:+8613912337992

Newsletter

Enter in your email address to receive deals
and coupons.
Bookmark us today!